skip to Main Content

Request design assistance

The following information is required to provide a recommendation for a simple run of trench drainage. On receipt of this form, ACO will provide a recommendation with hydraulic calculations where necessary.

For more complex layout please contact ACO .

CATCHMENT HYDRAULICS

Left (m)

Right (m)

such as downpipes, machinery etc. (l/s)

TRENCH DRAIN INFORMATION

A (m)

B (m)

Please select

OTHER INFORMATION

Trench hydraulic flow informationGrating intake performaceLayout schedule and parts listSurface water storage solutionsPlease contact me to discuss

ADDITIONAL RUNS

Run 2

years

Left (m)

Right (m)

such as downpipes, machinery etc. (l/s)

A (m)

B (m)

Please select

Run 3

years

Left (m)

Right (m)

such as downpipes, machinery etc. (l/s)

A (m)

B (m)

Please select

Run 4

years

Left (m)

Right (m)

such as downpipes, machinery etc. (l/s)

A (m)

B (m)

Please select

Run 5

years

Left (m)

Right (m)

such as downpipes, machinery etc. (l/s)

A (m)

B (m)

Please select

Length Width
Rainfall Intensity
Catchment Slope
Longitudinal Fall
Central To Width
Outlet Position
Catchment Length
Load Class
Back To Top